A place to turn boats, the winding hole was initially constructed as part of the dredging operation that took place in early 2011.
This is due to be improved during 2019.
(Tap / click images to enlarge)
A place to turn boats, the winding hole was initially constructed as part of the dredging operation that took place in early 2011.
This is due to be improved during 2019.
(Tap / click images to enlarge)
Canal: Stroudwater
Restoration Phase: 1A
Status: Complete
Access: Towpath
Updated: 02/12/2018