Phase 1A Restoration

Phase 1B Restoration

Stroudwater Navigation

Thames & Severn Canal

 

Restoration - Phase 1B

Phase 1B of the restoration of the Cotswold Canals covers the section of the Stroudwater Navigation between Saul Junction (Walk Bridge), with connection to the national waterways network, and 'The Ocean' in Stonehouse. This is the point where the Phase 1A restoration section starts.

The length of the Phase 1B restoration project is approximately 3.8 miles.

Despite the relatively short distance, there are some significant challenges to overcome. These include obstructions to the canal route caused by the M5, the A38 and a main-line railway.The M5, often seen as the most difficult of these, will probably be overcome by using an existing river bridge (River Frome) which is close to the original canal line.

Phase 1B restoration will include:

Funding

Currently there is insufficient funding for all the planned Phase 1B restoration activities.

More Information

Phase 1B route in photos

Canal Route

 

 

Saul Junction and point where Stroudwater joins inland waterways network

Walk Bridge, Saul.
Start pont of Phase 1B

A38 Obstruction

M5 Obstruction